
Structural works project and related works management
The expansion of the Hotel Cristoforo Colombo, located in c.so Buenos Aires, was carried out through a recovery operation of the attic floor with the creation of an additional raised floor.
The works to create the 20 new rooms and suites were carried out while the hotel was open and functioning thanks to the use of dry technologies: load-bearing structure and external walls in wood (Wood Beton Spa), dry screeds and internal plasterboard walls.
These choices were also dictated by the structural need to limit the new loads weighing on the historic building below.
The design of the crowning volumes, which remain hidden from the front on the main street, respecting the integrity of the original façade, recalls the shape of Parisian roofs but with a modern look in the use of materials.
Location : Milan, Italy
Surface area : 800 m²
Year of completion : 2017
Property : Worldhotel Cristoforo Colombo
Structural works : MSC Associati Srl - Wood Beton Spa
General contractor : BrusBan Company Srl - Wood Beton Spa
Collaboration carried out : Structural project and related works management


