

Primary and Secondary School, Via Battisti - Agrate Brianza, Italy
Fire resistance verification of structural works
The activities carried out focused on the definition of the structural elements and the different typologies present in each complex, strictly linked to a historical documentary analysis of the graphic drawings and documents relating to each construction and subsequent modifications.
An in-depth investigation plan and assistance in carrying out the relevant required material characterization tests was conducted.
In relation to the specific fire resistance requirements of the structures for each compartment, fire tests were carried out on the representative structural elements through tabular and/or analytical assessments. The various complexes and related assessments involved a total surface area of 21,120 m2.
Finally, a preparatory report was drawn up for planning the typological interventions containing methods and quantities for the purpose of making the structures compliant with the fire resistance point of view.

Primary School, Piazza Trivulzio 1 - Omate di Agrate Brianza, Italy

Nursery and Kindergarten, Via Savio - Agrate Brianza, Italy

Kindergarten, Via Fabio Filzi 54 - Omate di Agrate Brianza, Italy