Supervision of structural works
Structural works related to the project ''Adaptation and potential of the purification plant of San Giuliano Milanese over – 1st lot 2nd section''.
The project includes a series of interventions distributed in various sections of the purification plant which, in addition to the purpose of expansion and restructuring, also includes some extraordinary maintenance interventions aimed at improving the plant itself as a whole, such as the installation of an inlet flow meter, adjustment of the overflow thresholds in the preliminary treatments and primary sedimentation section, of the regulation gates in the secondary sedimentation distribution structure, construction of the discharge duct for the purified water directly into the Cavo Comelli to replace the existing open-air canal.
Location : San Giuliano Milanese (MI), Italy
Amount of works : €860,000
Client : CAP HOLDING SpA
Structural works management : Eng. Andrea Sangalli