top of page

G. Rodari School, Bernareggio

rodari bernareggio.png

Reduction of seismic risk

The “G. Rodari” school has been the subject of important seismic improvement interventions carried out in two different lots.

 

The first lot involved a structurally independent unit. Seismic improvement was achieved by installing metal carpentry to ensure rigid connection between the structural elements constituting the load-bearing frame of the building. All the masonry lintels were also secured using metal carpentry.

 

The second lot involved a structurally independent unit. A seismic improvement was achieved by installing suitable metal carpentry to ensure the rigid connection between the structural elements constituting the load-bearing framework of the building. In addition to the above, the corrugated sheet metal roofing was replaced with a roofing with a draining joint that was always active after thermal insulation.

Location : Bernareggio (MB), Italy

 

Total amount : €385,000

 

LOT 1 :

Building and structural design and related works management: Eng. Andrea Sangalli

 

LOT 2 :

Building and structural design and construction management of structural works: Eng. Andrea Sangalli

rodari bernareggio2_edited.jpg
rodaribernareggio4.jpg
rodaribernareggio3.png
bottom of page